· Engineering notes

SaaS release checklist: 15 checks before you ship on Friday

On-page checklist for teams without a dedicated QA hire. Copy into the release PR. No email wall. Soft pass/fail only - High security or load gaps still need evidence, not vibes.

Artifact: 15 checks

## Release X.Y — Friday gate
Owner: ____    Environment: staging URL ____

API / authz
[ ] 1. OpenAPI or route list updated for this release
[ ] 2. Negative test: object ID from tenant B with tenant A token → 403/404 (BOLA)
[ ] 3. Admin-only routes reject non-admin tokens
[ ] 4. Webhook consumer dedupes on event_id (retry safe)

Abuse / cost
[ ] 5. Rate limit on expensive POSTs (incl. webhooks); 429 + Retry-After observed
[ ] 6. Burst smoke does not produce unexplained 5xx climb

Data / contract
[ ] 7. Contract/schema CI green (or listed waivers with owner)
[ ] 8. Migrations reversible or expand/contract plan written
[ ] 9. PII fields not logged in new code paths

UI / critical path
[ ] 10. Critical path Playwright (or manual script) green on staging
[ ] 11. Date/amount validation: invalid values rejected client + server
[ ] 12. Feature flag default safe if roll-back needed

Ops
[ ] 13. Error budget / SLO note for this release (or explicit N/A)
[ ] 14. Dashboards/alerts touched by new paths still fire in staging test
[ ] 15. Rollback owner + command/link documented in the PR

Ship? Yes / No / Yes-with-waivers: ____

Where to go deeper on this site

What this checklist is not

It is not a pen test, not a load certification, and not a substitute for a written test plan on high-risk releases (test plan template). If more than two High items are waivers, slip the Friday tag.

If you want this list filled against your next release as a written gap list, book a free 20-min test audit.

Deeper misconfig list: 10 dangerous API configs.