ISTQB Test Activities & Testware: What Evidence to Keep

CTFL §1.4 for product teams: planning→completion activities, which testware to keep, traceability, and a BOLA-style finding evidence pack with HTTP + CI script.

CTFL section 1.4 defines a test process as a set of activities — planning, monitoring and control, analysis, design, implementation, execution, completion — and the testware each one produces. For a SaaS or fintech team, the useful question is not “did we fill the ISTQB form?” It is: can another engineer reproduce the failure and see why it matters from the artifacts alone?

Series: CTFL map · Seven principles. Syllabus: CTFL v4 §1.4.

The activities (not a waterfall)

CTFL lists activity groups in a logical order. In product teams they run iteratively and in parallel (analyse the next story while yesterday’s suite executes). Monitoring and control is continuous, not a single step.

Seven CTFL test activities with example testware for an API ownership check
Activity → testware chain for a cross-tenant GET. Monitoring sits beside every stage.
Activity Answers Typical testware (lean team)
Planning What / why / exit One-page plan, risk list, entry/exit
Monitoring & control Are we on track? CI status, flake rate, open Highs
Analysis What to test? Test conditions from AC / risks
Design How to test? Cases, charters, data needs
Implementation Ready to run? Scripts, fixtures, suites, env notes
Execution What happened? Logs, results, defect reports
Completion What do we keep? Summary, lessons, backlog items

Worked example: one story through the process

Test basis (user story AC):

Text
As a tenant user I can view my accounts.
Acceptance:
- Authenticated users only
- account.tenant_id must equal token.tenant_id
- Foreign account id → 403 or 404 (product chooses; be consistent)

Analysis → conditions

Text
C1  Valid owner can GET own account → 200
C2  User A + account_id of B → 403 or 404
C3  Missing/invalid token → 401
C4  Spec defect if AC omits ownership (raise in review — static)

Design → cases

ID Condition Steps (summary) Expected
TC-C2 C2 Login A; GET /v1/accounts/{id_B} 403 or 404
TC-C1 C1 Login A; GET /v1/accounts/{id_A} 200, own fields only

Implementation → script

JavaScript
// bola.accounts.test.js
import { test, expect } from 'vitest';

test('TC-C2 cross-tenant account read denied', async () => {
  const tokenA = await loginAs('[email protected]');
  const res = await fetch(`${API}/v1/accounts/${ACCOUNT_B}`, {
    headers: { Authorization: `Bearer ${tokenA}` },
  });
  expect([403, 404]).toContain(res.status);
});

Execution → evidence when it fails

If the suite returns 200 with tenant B data, execution testware is not “test failed.” It is a defect report with replayable evidence.

HTTP
GET /v1/accounts/acc_B HTTP/1.1
Host: api.example.com
Authorization: Bearer eyJhbGciOi...   # User A
HTTP
HTTP/1.1 200 OK
Content-Type: application/json

{
  "id": "acc_B",
  "tenant_id": "tenant_B",
  "balance_cents": 128450
}
Six-part evidence pack for a reproducible API finding
Minimum evidence pack. If reproduction needs a Slack thread, the testware is incomplete.

Finding template (execution testware)

Text
FINDING · High · API authorization (BOLA-class)
Claim:     GET /v1/accounts/{id} returns another tenant’s account when id is swapped.
Evidence:  token_A + ACCOUNT_B → HTTP 200 + balance_cents (redacted HAR attached).
Expected:  403 or 404 per AC.
Cause:     Query by id only; tenant not taken from verified token.
Action:    WHERE id=? AND tenant_id=?; add TC-C2 to CI merge gate.
Trace:     Story AW-184 · condition C2 · case TC-C2 · job api-authz#412

That block is CTFL defect report language in a form engineers will actually use.

Traceability (why CTFL insists on it)

CTFL 1.4.4: keep links between test basis ↔ testware ↔ results ↔ defects.

Lean mapping that fits a 15-person team:

Text
AW-184 (story)
  └─ C2 (condition)
       └─ TC-C2 (case) → bola.accounts.test.js
            └─ CI job api-authz
                 └─ Finding F-12 (if red) / green check (if pass)

Without that chain you cannot answer: “which tests does this AC need?” or “which AC did this failure break?”

Roles without a QA department

CTFL compares a test management role (plan, monitor, report) with a testing role (analyse, design, execute). In a small SaaS team one person may wear both — still separate the hats in the artifacts:

Hat Owns
Management Exit criteria, risk order, “ship / don’t ship” note
Testing Conditions, cases, scripts, evidence packs

Context changes the process (1.4.2)

Same activities, different depth:

Context Implementation testware Evidence bar
Marketing site copy Manual checklist Screenshot
Multi-tenant payments API Automated negatives in CI HTTP request/response + expected status
Regulated KYC export Cases + access matrix + retention note Who ran it, on which dataset, when

Completion: what to archive

At sprint or release end, CTFL completion keeps what future you will need:

  • Which High findings remain open (with owners)
  • Which suites are merge-gating vs nightly
  • Lessons (e.g. “ownership AC missing twice — update DoR”)
  • Scripts and fixtures under version control (configuration management)

Do not archive 40 screenshots of green runs. Archive failing evidence and the gate definition.

Checklist: minimum testware for an API risk

  • Condition written from AC or risk (not only a script name)
  • Case with principal + object id + expected status
  • Automated or charter step that can be re-run
  • On failure: claim, auth context, request, actual, expected, fix hint
  • Trace id back to story / risk
  • Exit criterion that names this check if it is High×High

FAQ

Do we need IEEE/ISO document names?

No. CTFL cares that the activities and work products exist. Name them plan, condition, case, log, finding — consistency beats ceremony.

Is a CI log enough evidence?

A red job is a signal. A finding needs the replayable request and expected result. Attach or link both.

Where do exploratory charters sit?

Design testware (alongside cases). Execution still produces notes/evidence; interesting failures become defect reports.

How does this connect to the seven principles?

Principle 1: green suite ≠ absence of defects — completion must list untested risks. Principle 5: refresh cases when surfaces change — that is design/implementation work, not only re-execution.

Next in the series

Sources

For a release-level Markdown test plan template, see test plan template for SaaS.

Want a second pair of eyes on your system?

Request the free 20-minute check-up: short written findings, non-intrusive, no obligation.

Free 20-min check-up →